Installation
Overview
On
the day of installation the installation engineer will
liaise with your ICT Coordinator to confirm
details as per survey or what was agreed verbally.
The
interactive whiteboard will be fixed to the wall at the
desired location and height from the floor.
The
data cables from the interactive whiteboard to the PC will
run in trunking usually to the bottom right or bottom left
of the whiteboard in relation to the positioning of the
lap top or pc and terminates at the junction boxes at this
location.
The
projector must be securely fixed to the ceiling of the
room using the appropriate mounting bracket.
If a false ceiling is present, a hole will be cut in the
ceiling tile, a trim plate fitted and a fixing pole of
appropriate length passed through and attached to the bracket
above maximum length we can install at is 3 meters .
Typically, the bracket is fixed so the projector is approximately
2.1 to 3.5 meters from the interactive whiteboard. The
projector will be positioned no less than 2.4 meters from
the floor and will sit secured using the appropriate fixing
plate to the pole mount.
The
data cables from the projector will either be contained
in trunking along the ceiling or out of sight above any
false ceiling. The cables will run vertically down the
wall in trunking to the termination boxes .
Speakers,
if ordered, will be mounted either side of the interactive
whiteboard. Cabling for the speakers will be run behind
the board, and will be routed through the existing trunking
(used for the whiteboard data cable) to the speaker termination
faceplate. The amplifier or Video will be positioned
close to the PC, laptop.
All
cabling will be securely contained in 16 mm x 25 mm white
trunking.
The
software for the interactive whiteboard will then be installed
on the PC or Lap Top , in order to demonstrate the operation
of the whiteboard, projector and the key elements of the
interactive software. Please note, we do not install on
to servers within networks if this required you need the
appropriate software from the interactive board suppler
and the administrator is required to be present. Once
all elements of the installation are finished, you
will be requested for your signature on our sign off form
with any comments. This sign off is to indicate that you
are satisfied with the installation.
E-mail: office@belainteractive.com